Plumcroft Primary School Washroom Refurbishments
Plumcroft Primary were approached by Interfix and welcomed the chance to discuss their washrooms.
They wanted smart fresh washrooms for the Staff and practical, easy to clean, hard wearing and hygienic washrooms for the children.
This involved extensive remodelling of the areas and took several attempts to get to the end result.
Although there were a lot of hurdles to clear, Interfix created a bespoke package that maximised the use of the areas without feeling overcrowded and answered all the essential criteria requested in the brief.
PROJECT DETAILS
Location
London SE18
Aspects covered
Stud wall Construction, Wall Hung WC Pans, Sensor Operated WC Flush, Sensor Operated Taps, Corian Troughs, Wall Hung Designer Sinks, Hygienic Wall Cladding, Velocity Cubicles in Solid Grade Laminate, Full Height WC Duct Panelling In Solid Grade Laminate, Full Height Urinal Duct Panelling In Solid Grade Laminate, Anti-Slip Vinyl Flooring, Extraction Systems Conversion to Mains Feed Water and Mirrors