Skip links

CFBL School – Washroom Refurbishment

Over the summer Interfix completed a washroom refurbishment for CFBL School. Based in Hempsted, Central London and home to 700 students aged 3 to 15 years old. CFBL boasts top-class facilities but needed to upgrade its washrooms. Noticing wear and tear, plus a few changes to the previous installation left the washrooms looking tired and in need of refurbishment.

CFBL School is home to students of over 35 nationalities offering French-English bilingual education. The school itself offers a joyful, creative and interactive learning environment with top-quality teachers. It was Interfix’s task to take the tired washrooms and create light and inspiring facilities to suit the rest of the school.

The refurbishment was carried out in the summer months. Originally CFBL School contacted Interfix with a very tight timeline towards the end of the final school term. Knowing how important it was for the client (CFBL School) for the work to be completed during the summer holidays, we pulled together our resources to achieve this. The school took care of the strip out and electrical work, saving us time. Interfix then installed full height cubicles, wall hung toilets, solid surface wash troughs with push taps and vinyl flooring. After the installation was completed, we decorated the washroom walls.

At the end of term CFBL School’s pupils left their school with dated and tired looking washrooms. Upon their return, they were greeted with modern, bright and top-class washroom facilities.

Toilet Cubicles

PROJECT DETAILS

Aspects Covered:

Full strip out, vinyl flooring, decoration of walls, new lighting and decoration of ceiling, solid surface washtroughs, solid grade laminate cubicles and WC duct panels, sensor taps and new hand dryers.