Washrooms at Johnson Matthey

Proving difficult to clean & maintain, Johnson Matthey wanted a washroom refurbishment that offered a new lease of life that was easy to maintain.

The answer to this was, was to refurbish the washroom with material and features that prolonged life, and would prevent deterioration. In order to meet these requirements Interfix installed Corian vanity tops, hygiene wall cladding, solid grade laminate flooring, and a new suspended ceiling. The project also included re-tiling the floor, and providing new sanitaryware.

Occupying a space of 40m2, the project was completed within 4 weeks. Throughout the project, Interfix were able to carry out work with limited access, due to a high level of security. Despite the level of demand from the client, and the less than ideal accessibility, Interfix delivered the project with success and on time.

The finalised washroom provided Johnson Matthey with a long lasting solution to upkeep & maintain these facilities.

PROJECT DETAILS

Aspects Covered

Corian vanity tops, hygienic wall cladding, solid grade laminate cubicles, safety flooring, suspended ceiling. The project also included re-tiling the floor, and providing new sanitaryware.