Washrooms at Holborn Gate
Faced with a potentially disastrous road-block to a washroom refurbishment project currently underway, Quad Contracts sought to replace a previously commissioned washroom supplier who went bust at the end of 2018 for their work commencing in January 2019.
Having worked with Interfix before which resulted in a completed project that they were very pleased with, Quad Contracts had no hesitations when asking us to replace their previous supplier on this project.
Due to the project’s urgency, we quickly got to work with the contractor to create a product that matched the original specification perfectly.
We had a greatly reduced time-frame to work within, however, we completed the manufacture and fitting of materials before the project end date.
Although the project was not without problems on-site, we managed to complete it in time and both the contractor and end client were very satisfied with the results.